Data from Baldwin Locomotive Works Specification for Engines as digitized by the DeGolyer Library of Southern Methodist University, Volume 66, p. 327+. Works number was 52127 in August 1919.
In 1909, Mendes Lima was a purveyor of codfish in Pernambuco. This wood-burning plantation side tank was ordered about a decade later, either to support a plantation business or to work dockside.
Always on guard against starting fires with their wood-burning engines, Baldwin's customer requested a change described in a "Hereafter" note in the specs: "Ash pans to have netting under dampers and ash pan slide work to be omitted." Already specified was the spark-arresting, 9" (229 mm) Rushton Improved stack.
Principal Dimensions by Steve Llanso of Middle Run Media | |
---|---|
Class | unknown |
Locobase ID | 15165 |
Railroad | Meno, Lima & Company |
Country | Brazil |
Whyte | 0-6-0T |
Number in Class | 1 |
Road Numbers | |
Gauge | 75 cm |
Number Built | 1 |
Builder | Baldwin |
Year | 1919 |
Valve Gear | Stephenson |
Locomotive Length and Weight | |
Driver Wheelbase (ft / m) | 6.25 / 1.90 |
Engine Wheelbase (ft / m) | 6.25 / 1.90 |
Ratio of driving wheelbase to overall engine wheelbase | 1 |
Overall Wheelbase (engine & tender) (ft / m) | 6.25 / 1.90 |
Axle Loading (Maximum Weight per Axle) (lbs / kg) | |
Weight on Drivers (lbs / kg) | 25,500 / 11,567 |
Engine Weight (lbs / kg) | 25,500 / 11,567 |
Tender Loaded Weight (lbs / kg) | |
Total Engine and Tender Weight (lbs / kg) | |
Tender Water Capacity (gals / ML) | 250 / 0.95 |
Tender Fuel Capacity (oil/coal) (gals/tons / Liters/MT) | |
Minimum weight of rail (calculated) (lb/yd / kg/m) | 14 / 7 |
Geometry Relating to Tractive Effort | |
Driver Diameter (in / mm) | 28 / 711 |
Boiler Pressure (psi / kPa) | 160 / 1100 |
High Pressure Cylinders (dia x stroke) (in / mm) | 9" x 14" / 229x356 |
Tractive Effort (lbs / kg) | 5508 / 2498.39 |
Factor of Adhesion (Weight on Drivers/Tractive Effort) | 4.63 |
Heating Ability | |
Tubes (number - dia) (in / mm) | 56 - 1.2" / 30 |
Flues (number - dia) (in / mm) | |
Flue/Tube length (ft / m) | 6.88 / 2.10 |
Firebox Area (sq ft / m2) | 24 / 2.23 |
Grate Area (sq ft / m2) | 5.50 / 0.51 |
Evaporative Heating Surface (sq ft / m2) | 174 / 16.16 |
Superheating Surface (sq ft / m2) | |
Combined Heating Surface (sq ft / m2) | 174 / 16.16 |
Evaporative Heating Surface/Cylinder Volume | 168.80 |
Computations Relating to Power Output (More Information) | |
Robert LeMassena's Power Computation | 880 |
Same as above plus superheater percentage | 880 |
Same as above but substitute firebox area for grate area | 3840 |
Power L1 | 2130 |
Power MT | 552.45 |