Data from Alco class 262 T 101 Order S-1731 builder's card supplied in February 2023 by Teemu Koivumaki.. Works numbers were 68622 in March 1932.
Locobase's first impression of the customer suggested a Texas-based industrial operation. Well, the Cia Nacional di Ceimento Portland was in fact a materials producer, but its name and the track's metre gauge width fit this Texas subsidiaries activities in Brazil. (The parent company was founded in 1919 operating in 9 states and in Brazil, Argentina, Cuba, and Uruguay.
This wood-burning Prairie tank joined two 0-4-0Ts
| Principal Dimensions by Steve Llanso of Middle Run Media | |
|---|---|
| Class | 3 |
| Locobase ID | 21122 |
| Railroad | Lone Star Cement |
| Country | Brazil |
| Whyte | 2-8-2 |
| Number in Class | 1 |
| Road Numbers | 3 |
| Gauge | Metre |
| Number Built | 1 |
| Builder | Alco-Schenectady |
| Year | 1932 |
| Valve Gear | Walschaert |
| Locomotive Length and Weight | |
| Driver Wheelbase (ft / m) | 8 / 2.44 |
| Engine Wheelbase (ft / m) | 22.50 / 6.86 |
| Ratio of driving wheelbase to overall engine wheelbase | 0.36 |
| Overall Wheelbase (engine & tender) (ft / m) | 22.50 / 6.86 |
| Axle Loading (Maximum Weight per Axle) (lbs / kg) | |
| Weight on Drivers (lbs / kg) | 78,300 / 35,516 |
| Engine Weight (lbs / kg) | 101,000 / 45,813 |
| Tender Loaded Weight (lbs / kg) | |
| Total Engine and Tender Weight (lbs / kg) | |
| Tender Water Capacity (gals / ML) | 1500 / 5.68 |
| Tender Fuel Capacity (oil/coal) (gals/tons / Liters/MT) | |
| Minimum weight of rail (calculated) (lb/yd / kg/m) | 33 / 16.50 |
| Geometry Relating to Tractive Effort | |
| Driver Diameter (in / mm) | 37 / 940 |
| Boiler Pressure (psi / kPa) | 185 / 1280 |
| High Pressure Cylinders (dia x stroke) (in / mm) | 15" x 20" / 381x508 |
| Tractive Effort (lbs / kg) | 19,125 / 8674.96 |
| Factor of Adhesion (Weight on Drivers/Tractive Effort) | 4.09 |
| Heating Ability | |
| Tubes (number - dia) (in / mm) | 156 - 2" / 51 |
| Flues (number - dia) (in / mm) | |
| Flue/Tube length (ft / m) | 11.67 / 3.56 |
| Firebox Area (sq ft / m2) | 74 / 6.87 |
| Grate Area (sq ft / m2) | 20 / 1.86 |
| Evaporative Heating Surface (sq ft / m2) | 1020 / 94.76 |
| Superheating Surface (sq ft / m2) | |
| Combined Heating Surface (sq ft / m2) | 1020 / 94.76 |
| Evaporative Heating Surface/Cylinder Volume | 249.35 |
| Computations Relating to Power Output (More Information) | |
| Robert LeMassena's Power Computation | 3700 |
| Same as above plus superheater percentage | 3700 |
| Same as above but substitute firebox area for grate area | 13,690 |
| Power L1 | 3877 |
| Power MT | 436.64 |