Data from Baldwin Locomotive Works Specification for Engines as digitized by the DeGolyer Library of Southern Methodist University, Volume 23 p. 24. Works numbers were 17739-17740 in May 1900.
The Tientsin-Pukow (which lay across the river from Nanking) was first bruited by German interests in 1899. After fits and starts and a couple of wars, the German concession was revived in 1908. At this point the Chinese government was able to insist on relatively favorable terms. The 674-mile line did not open to through traffic until 1912 and consisted of the German-built Northern section and the British-built Southern portion.
Principal Dimensions by Steve Llanso of Middle Run Media | |
---|---|
Class | 31 |
Locobase ID | 12411 |
Railroad | Pekin-Hankow |
Country | China |
Whyte | 2-6-0 |
Number in Class | 2 |
Road Numbers | 31-32 |
Gauge | Std |
Number Built | 2 |
Builder | Burnham, Williams & Co |
Year | 1900 |
Valve Gear | Stephenson |
Locomotive Length and Weight | |
Driver Wheelbase (ft / m) | 15 / 4.57 |
Engine Wheelbase (ft / m) | 23.25 / 7.09 |
Ratio of driving wheelbase to overall engine wheelbase | 0.65 |
Overall Wheelbase (engine & tender) (ft / m) | |
Axle Loading (Maximum Weight per Axle) (lbs / kg) | |
Weight on Drivers (lbs / kg) | 96,000 / 43,545 |
Engine Weight (lbs / kg) | 117,000 / 53,070 |
Tender Loaded Weight (lbs / kg) | 96,000 / 43,545 |
Total Engine and Tender Weight (lbs / kg) | 213,000 / 96,615 |
Tender Water Capacity (gals / ML) | 4800 / 18.18 |
Tender Fuel Capacity (oil/coal) (gals/tons / Liters/MT) | |
Minimum weight of rail (calculated) (lb/yd / kg/m) | 53 / 26.50 |
Geometry Relating to Tractive Effort | |
Driver Diameter (in / mm) | 60 / 1524 |
Boiler Pressure (psi / kPa) | 180 / 1240 |
High Pressure Cylinders (dia x stroke) (in / mm) | 19" x 24" / 483x610 |
Tractive Effort (lbs / kg) | 22,093 / 10021.23 |
Factor of Adhesion (Weight on Drivers/Tractive Effort) | 4.35 |
Heating Ability | |
Tubes (number - dia) (in / mm) | 238 - 2" / 51 |
Flues (number - dia) (in / mm) | |
Flue/Tube length (ft / m) | 12 / 3.66 |
Firebox Area (sq ft / m2) | 123 / 11.43 |
Grate Area (sq ft / m2) | 24.60 / 2.29 |
Evaporative Heating Surface (sq ft / m2) | 1608 / 149.44 |
Superheating Surface (sq ft / m2) | |
Combined Heating Surface (sq ft / m2) | 1608 / 149.44 |
Evaporative Heating Surface/Cylinder Volume | 204.17 |
Computations Relating to Power Output (More Information) | |
Robert LeMassena's Power Computation | 4428 |
Same as above plus superheater percentage | 4428 |
Same as above but substitute firebox area for grate area | 22,140 |
Power L1 | 5081 |
Power MT | 350.05 |