Data from Baldwin Locomotive Works Specification for Engines as digitized by the DeGolyer Library of Southern Methodist University Volume 36, p. 334 . Works numbers were 35936-35937 in January 1911.
This railway was another Manchurian line that served the Laotung Peninsula.
Principal Dimensions by Steve Llanso of Middle Run Media | |
---|---|
Class | 1 |
Locobase ID | 13784 |
Railroad | Imperial Laotung |
Country | China |
Whyte | 2-6-2T |
Number in Class | 2 |
Road Numbers | 1-2 |
Gauge | Std |
Number Built | 2 |
Builder | Baldwin |
Year | 1911 |
Valve Gear | Stephenson |
Locomotive Length and Weight | |
Driver Wheelbase (ft / m) | 8.33 / 2.54 |
Engine Wheelbase (ft / m) | 22.50 / 6.86 |
Ratio of driving wheelbase to overall engine wheelbase | 0.37 |
Overall Wheelbase (engine & tender) (ft / m) | 22.50 / 6.86 |
Axle Loading (Maximum Weight per Axle) (lbs / kg) | |
Weight on Drivers (lbs / kg) | 83,520 / 37,884 |
Engine Weight (lbs / kg) | 116,420 / 52,807 |
Tender Loaded Weight (lbs / kg) | |
Total Engine and Tender Weight (lbs / kg) | 116,420 / 52,807 |
Tender Water Capacity (gals / ML) | 1500 / 5.68 |
Tender Fuel Capacity (oil/coal) (gals/tons / Liters/MT) | 3.40 / 3 |
Minimum weight of rail (calculated) (lb/yd / kg/m) | 46 / 23 |
Geometry Relating to Tractive Effort | |
Driver Diameter (in / mm) | 46 / 1168 |
Boiler Pressure (psi / kPa) | 160 / 1100 |
High Pressure Cylinders (dia x stroke) (in / mm) | 17" x 22" / 432x559 |
Tractive Effort (lbs / kg) | 18,798 / 8526.64 |
Factor of Adhesion (Weight on Drivers/Tractive Effort) | 4.44 |
Heating Ability | |
Tubes (number - dia) (in / mm) | 190 - 2" / 51 |
Flues (number - dia) (in / mm) | |
Flue/Tube length (ft / m) | 10.21 / 3.11 |
Firebox Area (sq ft / m2) | 91.60 / 8.51 |
Grate Area (sq ft / m2) | 14.40 / 1.34 |
Evaporative Heating Surface (sq ft / m2) | 1099 / 102.10 |
Superheating Surface (sq ft / m2) | |
Combined Heating Surface (sq ft / m2) | 1099 / 102.10 |
Evaporative Heating Surface/Cylinder Volume | 190.15 |
Computations Relating to Power Output (More Information) | |
Robert LeMassena's Power Computation | 2304 |
Same as above plus superheater percentage | 2304 |
Same as above but substitute firebox area for grate area | 14,656 |
Power L1 | 3305 |
Power MT | 261.72 |