Data from Baldwin Locomotive Works Specification for Engines as digitized by the DeGolyer Library of Southern Methodist University Volume 63, p. 411+. (Thanks to Ivo Rutishauser for his 10 February 2026 email correcting the country.) Works number was 52316 in September 1919.
This very light sugar-cane railway had 45 lb/yard (22.5 kg/metre) rail that scaled maximum grades of 3% and curve radii of 94 feet (28.7 metres) so the bi-fuel (coal or wood) plantation Mogul fit right in. The Central was located 214 km (133 miles) east of Havana.
| Principal Dimensions by Steve Llanso of Middle Run Media | |
|---|---|
| Class | Eulalia |
| Locobase ID | 14800 |
| Railroad | Central Dulce Nombre de Jesus |
| Country | Cuba |
| Whyte | 2-6-0 |
| Number in Class | 1 |
| Road Numbers | 1 |
| Gauge | 3' |
| Number Built | 1 |
| Builder | Baldwin |
| Year | 1919 |
| Valve Gear | Stephenson |
| Locomotive Length and Weight | |
| Driver Wheelbase (ft / m) | 6.75 / 2.06 |
| Engine Wheelbase (ft / m) | 11.83 / 3.61 |
| Ratio of driving wheelbase to overall engine wheelbase | 0.57 |
| Overall Wheelbase (engine & tender) (ft / m) | 31.92 / 9.73 |
| Axle Loading (Maximum Weight per Axle) (lbs / kg) | |
| Weight on Drivers (lbs / kg) | 24,700 / 11,204 |
| Engine Weight (lbs / kg) | 28,000 / 12,701 |
| Tender Loaded Weight (lbs / kg) | 20,700 / 9389 |
| Total Engine and Tender Weight (lbs / kg) | 48,700 / 22,090 |
| Tender Water Capacity (gals / ML) | 800 / 3.03 |
| Tender Fuel Capacity (oil/coal) (gals/tons / Liters/MT) | 2 / 2 |
| Minimum weight of rail (calculated) (lb/yd / kg/m) | 14 / 7 |
| Geometry Relating to Tractive Effort | |
| Driver Diameter (in / mm) | 33 / 838 |
| Boiler Pressure (psi / kPa) | 160 / 1100 |
| High Pressure Cylinders (dia x stroke) (in / mm) | 9" x 16" / 229x406 |
| Tractive Effort (lbs / kg) | 5341 / 2422.64 |
| Factor of Adhesion (Weight on Drivers/Tractive Effort) | 4.62 |
| Heating Ability | |
| Tubes (number - dia) (in / mm) | 51 - 1.75" / 44 |
| Flues (number - dia) (in / mm) | |
| Flue/Tube length (ft / m) | 9.75 / 2.97 |
| Firebox Area (sq ft / m2) | 32 / 2.97 |
| Grate Area (sq ft / m2) | 5.73 / 0.53 |
| Evaporative Heating Surface (sq ft / m2) | 258 / 23.97 |
| Superheating Surface (sq ft / m2) | |
| Combined Heating Surface (sq ft / m2) | 258 / 23.97 |
| Evaporative Heating Surface/Cylinder Volume | 219.00 |
| Computations Relating to Power Output (More Information) | |
| Robert LeMassena's Power Computation | 917 |
| Same as above plus superheater percentage | 917 |
| Same as above but substitute firebox area for grate area | 5120 |
| Power L1 | 3122 |
| Power MT | 835.97 |