Data from Baldwin Locomotive Works Specification for Engines as digitized by the DeGolyer Library of Southern Methodist University Volume 66, pp. 27+ and Volume 79, pp. 34+. Works numbers were 55801 in November 1922 and 60066-60067 in June 1927.
These superheated oil-burning sugar Mikados were ordered for the 3-foot (914 mm) gauge, but the engines were converted to the standard gauge by Baldwin's Extra Work Department before delivery. 8" (203 mm) piston valves admitted steam to the cylinders. According to the specs, the front sand box was moved toward the smokebox to allow locating the bell between the sand box and the dome. The rear sand box was moved back further to straighten the sand pipes.
Principal Dimensions by Steve Llanso of Middle Run Media | |
---|---|
Class | 26 |
Locobase ID | 15058 |
Railroad | Banes Railroad (United Fruit) |
Country | Cuba |
Whyte | 2-8-2 |
Number in Class | 3 |
Road Numbers | 26-28 |
Gauge | Std |
Number Built | 3 |
Builder | Baldwin |
Year | 1922 |
Valve Gear | Walschaert |
Locomotive Length and Weight | |
Driver Wheelbase (ft / m) | 12 / 3.66 |
Engine Wheelbase (ft / m) | 19.50 / 5.94 |
Ratio of driving wheelbase to overall engine wheelbase | 0.62 |
Overall Wheelbase (engine & tender) (ft / m) | 46.54 / 14.19 |
Axle Loading (Maximum Weight per Axle) (lbs / kg) | |
Weight on Drivers (lbs / kg) | 82,000 / 37,195 |
Engine Weight (lbs / kg) | 100,000 / 45,359 |
Tender Loaded Weight (lbs / kg) | 59,400 / 26,943 |
Total Engine and Tender Weight (lbs / kg) | 159,400 / 72,302 |
Tender Water Capacity (gals / ML) | 2800 / 10.61 |
Tender Fuel Capacity (oil/coal) (gals/tons / Liters/MT) | 1500 / 5678 |
Minimum weight of rail (calculated) (lb/yd / kg/m) | 34 / 17 |
Geometry Relating to Tractive Effort | |
Driver Diameter (in / mm) | 36 / 914 |
Boiler Pressure (psi / kPa) | 160 / 1100 |
High Pressure Cylinders (dia x stroke) (in / mm) | 16" x 20" / 406x508 |
Tractive Effort (lbs / kg) | 19,342 / 8773.39 |
Factor of Adhesion (Weight on Drivers/Tractive Effort) | 4.24 |
Heating Ability | |
Tubes (number - dia) (in / mm) | 118 - 2" / 51 |
Flues (number - dia) (in / mm) | 16 - 5" / 127 |
Flue/Tube length (ft / m) | 14.17 / 4.32 |
Firebox Area (sq ft / m2) | 72 / 6.69 |
Grate Area (sq ft / m2) | 16.80 / 1.56 |
Evaporative Heating Surface (sq ft / m2) | 1127 / 104.74 |
Superheating Surface (sq ft / m2) | 252 / 23.42 |
Combined Heating Surface (sq ft / m2) | 1379 / 128.16 |
Evaporative Heating Surface/Cylinder Volume | 242.15 |
Computations Relating to Power Output (More Information) | |
Robert LeMassena's Power Computation | 2688 |
Same as above plus superheater percentage | 3172 |
Same as above but substitute firebox area for grate area | 13,594 |
Power L1 | 7745 |
Power MT | 832.92 |