Data from DeGolyer, Vol 60, pp. 311. Works numbers were 53371, 53397 in July 1920.
The SGAE was a sugar trust, a corporation that, at the time these two Moguls were purchased, controlled about 52% of all of Spain's sugar production. Other Locobase entries from this time show that other Spanish industrial concerns bought idential 2-6-0s at this time. A locomotive of the exact design (allowing for gauge differences) was delivered to South Carolina's Pickens Railroad a year earlier (Locobase 14679).
| Principal Dimensions by Steve Llanso of Middle Run Media | |
|---|---|
| Class | 4 |
| Locobase ID | 14649 |
| Railroad | Sociedad General Azucarera de Espa'a |
| Country | Spain |
| Whyte | 2-6-0 |
| Number in Class | 2 |
| Road Numbers | 4-5 |
| Gauge | 5'6" |
| Number Built | 2 |
| Builder | Baldwin |
| Year | 1920 |
| Valve Gear | Walschaert |
| Locomotive Length and Weight | |
| Driver Wheelbase (ft / m) | 10.50 / 3.20 |
| Engine Wheelbase (ft / m) | 17.67 / 5.39 |
| Ratio of driving wheelbase to overall engine wheelbase | 0.59 |
| Overall Wheelbase (engine & tender) (ft / m) | 43 / 13.11 |
| Axle Loading (Maximum Weight per Axle) (lbs / kg) | |
| Weight on Drivers (lbs / kg) | 84,000 / 38,102 |
| Engine Weight (lbs / kg) | 100,000 / 45,359 |
| Tender Loaded Weight (lbs / kg) | 65,000 / 29,484 |
| Total Engine and Tender Weight (lbs / kg) | 165,000 / 74,843 |
| Tender Water Capacity (gals / ML) | 3000 / 11.36 |
| Tender Fuel Capacity (oil/coal) (gals/tons / Liters/MT) | 6 / 6 |
| Minimum weight of rail (calculated) (lb/yd / kg/m) | 47 / 23.50 |
| Geometry Relating to Tractive Effort | |
| Driver Diameter (in / mm) | 48 / 1219 |
| Boiler Pressure (psi / kPa) | 180 / 1240 |
| High Pressure Cylinders (dia x stroke) (in / mm) | 16" x 24" / 406x610 |
| Tractive Effort (lbs / kg) | 19,584 / 8883.16 |
| Factor of Adhesion (Weight on Drivers/Tractive Effort) | 4.29 |
| Heating Ability | |
| Tubes (number - dia) (in / mm) | 212 - 2" / 51 |
| Flues (number - dia) (in / mm) | |
| Flue/Tube length (ft / m) | 10.17 / 3.10 |
| Firebox Area (sq ft / m2) | 104.10 / 9.67 |
| Grate Area (sq ft / m2) | 24.30 / 2.26 |
| Evaporative Heating Surface (sq ft / m2) | 1219 / 113.25 |
| Superheating Surface (sq ft / m2) | |
| Combined Heating Surface (sq ft / m2) | 1219 / 113.25 |
| Evaporative Heating Surface/Cylinder Volume | 218.26 |
| Computations Relating to Power Output (More Information) | |
| Robert LeMassena's Power Computation | 4374 |
| Same as above plus superheater percentage | 4374 |
| Same as above but substitute firebox area for grate area | 18,738 |
| Power L1 | 4485 |
| Power MT | 353.13 |