Jura-Bern-Luzern-Bahn 0-6-0 Locomotives in Switzerland


Class Details by Steve Llanso of Sweat House Media

Class G 3/3 (Locobase 8047)

Data from [link]

These were small six-coupled tanks that operated on the relatively flat Interlaken-Meiringen and Giswil-Lucerne sections. That the ten loks had SLM works numbers 475-476 (1887), 496-498 (1888), 584 (1889), 880 (1894), 1089 (1898), and 1342-1343 (1901) shows over how long a period the class was acquired. The Chemin de fer BiFre-Apples-Morges (BAM) bought three more from the same batch that delivered the 306 to the JBL. In 1903, the SLM delivered two more to the Montreux-Oberland Bernois-Bahn (MOB). These had smaller drivers

By 1905, they were being superseded by G 3/4s. The first three were retired in 1911. K.u.K Hersverwaltung

Principal Dimensions by Steve Llanso of Middle Run Media
ClassG 3/3
Locobase ID8047
RailroadJura-Bern-Luzern-Bahn (JBL)
CountrySwitzerland
Whyte0-6-0T
Number in Class10
Road Numbers301-310
GaugeMetre
Number Built10
BuilderSLM
Year1887
Valve GearWalschaert
Locomotive Length and Weight
Driver Wheelbase (ft / m) 8.20 / 2.50
Engine Wheelbase (ft / m) 8.20 / 2.50
Ratio of driving wheelbase to overall engine wheelbase1
Overall Wheelbase (engine & tender) (ft / m) 8.20 / 2.50
Axle Loading (Maximum Weight per Axle) (lbs / kg)
Weight on Drivers (lbs / kg)44,533 / 20,200
Engine Weight (lbs / kg)44,533 / 20,200
Tender Loaded Weight (lbs / kg)
Total Engine and Tender Weight (lbs / kg)44,533 / 20,200
Tender Water Capacity (gals / ML)686 / 2.60
Tender Fuel Capacity (oil/coal) (gals/tons / Liters/MT) 0.60 / 1
Minimum weight of rail (calculated) (lb/yd / kg/m)25 / 12.50
Geometry Relating to Tractive Effort
Driver Diameter (in / mm)41.30 / 1050
Boiler Pressure (psi / kPa)174 / 1200
High Pressure Cylinders (dia x stroke) (in / mm)12.2" x 18.9" / 310x480
Tractive Effort (lbs / kg)10,074 / 4569.49
Factor of Adhesion (Weight on Drivers/Tractive Effort) 4.42
Heating Ability
Tubes (number - dia) (in / mm)
Flues (number - dia) (in / mm)
Flue/Tube length (ft / m) 9.51 / 2.90
Firebox Area (sq ft / m2)
Grate Area (sq ft / m2) 8.61 / 0.80
Evaporative Heating Surface (sq ft / m2)607 / 56.40
Superheating Surface (sq ft / m2)
Combined Heating Surface (sq ft / m2)607 / 56.40
Evaporative Heating Surface/Cylinder Volume237.37
Computations Relating to Power Output (More Information)
Robert LeMassena's Power Computation1498
Same as above plus superheater percentage1498
Same as above but substitute firebox area for grate area
Power L1
Power MT

All material Copyright © SteamLocomotive.com
Wes Barris