Data from John H White, Jr, A History of the American Locomotive: Its Development: 1830-1880 (New York: Dover Publications, 1979 - original publication in 1968). See also Paul B Mattice, "The Catskill and Canajoharie Railroad ", archived at [], last accessed 9 July 2023; and "General History of Greene County", p 49, archived at [
], last accessed 9 July 2023.
Based on a description published by Paul R Hodge (who may have designed it) in 1840. He claimed that the engine had pulled a 220-ton load at 14 miles up a slope. It cost $6,300.
The C&C connected Catskill with Cooksburgh, 26 miles distant.
Principal Dimensions by Steve Llanso of Middle Run Media | |
---|---|
Class | unknown |
Locobase ID | 1027 |
Railroad | Catskill & Canajoharie |
Country | USA |
Whyte | 4-2-0 |
Number in Class | 1 |
Road Numbers | |
Gauge | Std |
Number Built | 1 |
Builder | Henry R Dunham & Co |
Year | 1837 |
Valve Gear | |
Locomotive Length and Weight | |
Driver Wheelbase (ft / m) | |
Engine Wheelbase (ft / m) | |
Ratio of driving wheelbase to overall engine wheelbase | |
Overall Wheelbase (engine & tender) (ft / m) | |
Axle Loading (Maximum Weight per Axle) (lbs / kg) | |
Weight on Drivers (lbs / kg) | |
Engine Weight (lbs / kg) | 19,000 |
Tender Loaded Weight (lbs / kg) | |
Total Engine and Tender Weight (lbs / kg) | |
Tender Water Capacity (gals / ML) | |
Tender Fuel Capacity (oil/coal) (gals/tons / Liters/MT) | |
Minimum weight of rail (calculated) (lb/yd / kg/m) | |
Geometry Relating to Tractive Effort | |
Driver Diameter (in / mm) | 54 / 1372 |
Boiler Pressure (psi / kPa) | 50 / 340 |
High Pressure Cylinders (dia x stroke) (in / mm) | 10.5" x 16" / 267x406 |
Tractive Effort (lbs / kg) | 1388 / 629.59 |
Factor of Adhesion (Weight on Drivers/Tractive Effort) | |
Heating Ability | |
Tubes (number - dia) (in / mm) | 136 - 1.5" / 38 |
Flues (number - dia) (in / mm) | |
Flue/Tube length (ft / m) | |
Firebox Area (sq ft / m2) | |
Grate Area (sq ft / m2) | 9 / 0.84 |
Evaporative Heating Surface (sq ft / m2) | |
Superheating Surface (sq ft / m2) | |
Combined Heating Surface (sq ft / m2) | |
Evaporative Heating Surface/Cylinder Volume | |
Computations Relating to Power Output (More Information) | |
Robert LeMassena's Power Computation | 450 |
Same as above plus superheater percentage | 450 |
Same as above but substitute firebox area for grate area | |
Power L1 | |
Power MT |