Data from Baldwin Locomotive Works Specification for Engines as digitized by the DeGolyer Library of Southern Methodist University Volume 22, p. 188. Works number was 22222 in May 1903.
One of many Pennsylvania short lines, the KRR ultimately connected Camp Halsey with Farmers Valley, which were 24 1/2 miles apart. It was not a well-founded line, apparently, as it was closed in 1906. At that point the engine went to work on the Mount Jewett, Kinzua & Ritterville, which crossed the abandoned KRR at Gaffney.
The TR was scrapped in 1930.
Principal Dimensions by Steve Llanso of Middle Run Media | |
---|---|
Class | Theodore Roosevelt |
Locobase ID | 12679 |
Railroad | Kushequa |
Country | USA |
Whyte | 4-6-0 |
Number in Class | 1 |
Road Numbers | 13 |
Gauge | Std |
Number Built | 1 |
Builder | Burnham, Williams & Co |
Year | 1903 |
Valve Gear | Stephenson |
Locomotive Length and Weight | |
Driver Wheelbase (ft / m) | 13.83 / 4.22 |
Engine Wheelbase (ft / m) | 24.06 / 7.33 |
Ratio of driving wheelbase to overall engine wheelbase | 0.57 |
Overall Wheelbase (engine & tender) (ft / m) | |
Axle Loading (Maximum Weight per Axle) (lbs / kg) | |
Weight on Drivers (lbs / kg) | 86,000 / 39,009 |
Engine Weight (lbs / kg) | 111,000 / 50,349 |
Tender Loaded Weight (lbs / kg) | 62,000 / 28,123 |
Total Engine and Tender Weight (lbs / kg) | 173,000 / 78,472 |
Tender Water Capacity (gals / ML) | 3000 / 11.36 |
Tender Fuel Capacity (oil/coal) (gals/tons / Liters/MT) | |
Minimum weight of rail (calculated) (lb/yd / kg/m) | 48 / 24 |
Geometry Relating to Tractive Effort | |
Driver Diameter (in / mm) | 56 / 1422 |
Boiler Pressure (psi / kPa) | 160 / 1100 |
High Pressure Cylinders (dia x stroke) (in / mm) | 18" x 24" / 457x610 |
Tractive Effort (lbs / kg) | 18,885 / 8566.10 |
Factor of Adhesion (Weight on Drivers/Tractive Effort) | 4.55 |
Heating Ability | |
Tubes (number - dia) (in / mm) | 230 - 2" / 51 |
Flues (number - dia) (in / mm) | |
Flue/Tube length (ft / m) | 12.33 / 3.76 |
Firebox Area (sq ft / m2) | 125 / 11.62 |
Grate Area (sq ft / m2) | 20.80 / 1.93 |
Evaporative Heating Surface (sq ft / m2) | 1600 / 148.70 |
Superheating Surface (sq ft / m2) | |
Combined Heating Surface (sq ft / m2) | 1600 / 148.70 |
Evaporative Heating Surface/Cylinder Volume | 226.31 |
Computations Relating to Power Output (More Information) | |
Robert LeMassena's Power Computation | 3328 |
Same as above plus superheater percentage | 3328 |
Same as above but substitute firebox area for grate area | 20,000 |
Power L1 | 4700 |
Power MT | 361.46 |