Data from Baldwin Locomotive Works Specification for Engines as digitized by the DeGolyer Library of Southern Methodist University Volumes 63. p. 263. Works number was 52435 in October 1919.
Delivered as an oil burner, this multi-fuel plantation tank's specifications required that the oil tank be so mounted as to be easily removed in favor of either coal or wood fuel. The details do not include whether the firebrick that lined the firebox was to be removable in such instances.
Although the spec does not say so specificially, the "extras" ordered through the Extra Work Department likely included plain bars for wood burning and a rocking grate for coal. (Locobase wonders if such a conversion ever actually occurred.)
| Principal Dimensions by Steve Llanso of Middle Run Media | |
|---|---|
| Class | 4 |
| Locobase ID | 14764 |
| Railroad | Central Puerto Real |
| Country | USA |
| Whyte | 0-6-2T |
| Number in Class | 1 |
| Road Numbers | 4 |
| Gauge | 3' |
| Number Built | 1 |
| Builder | Burnham, Williams & Co |
| Year | 1919 |
| Valve Gear | Stephenson |
| Locomotive Length and Weight | |
| Driver Wheelbase (ft / m) | 7.58 / 2.31 |
| Engine Wheelbase (ft / m) | 15 / 4.57 |
| Ratio of driving wheelbase to overall engine wheelbase | 0.51 |
| Overall Wheelbase (engine & tender) (ft / m) | 15 / 4.57 |
| Axle Loading (Maximum Weight per Axle) (lbs / kg) | |
| Weight on Drivers (lbs / kg) | 42,000 / 19,051 |
| Engine Weight (lbs / kg) | 50,000 / 22,680 |
| Tender Loaded Weight (lbs / kg) | |
| Total Engine and Tender Weight (lbs / kg) | |
| Tender Water Capacity (gals / ML) | 800 / 3.03 |
| Tender Fuel Capacity (oil/coal) (gals/tons / Liters/MT) | 350 / 1324.80 |
| Minimum weight of rail (calculated) (lb/yd / kg/m) | 23 / 11.50 |
| Geometry Relating to Tractive Effort | |
| Driver Diameter (in / mm) | 33 / 838 |
| Boiler Pressure (psi / kPa) | 160 / 1090 |
| High Pressure Cylinders (dia x stroke) (in / mm) | 11" x 16" / 279x406 |
| Tractive Effort (lbs / kg) | 7979 / 3619.22 |
| Factor of Adhesion (Weight on Drivers/Tractive Effort) | 5.26 |
| Heating Ability | |
| Tubes (number - dia) (in / mm) | 65 - 2" / 51 |
| Flues (number - dia) (in / mm) | |
| Flue/Tube length (ft / m) | 11.02 / 3.36 |
| Firebox Area (sq ft / m2) | 39 / 3.62 |
| Grate Area (sq ft / m2) | 6.30 / 0.59 |
| Evaporative Heating Surface (sq ft / m2) | 411 / 38.18 |
| Superheating Surface (sq ft / m2) | |
| Combined Heating Surface (sq ft / m2) | 411 / 38.18 |
| Evaporative Heating Surface/Cylinder Volume | 233.52 |
| Computations Relating to Power Output (More Information) | |
| Robert LeMassena's Power Computation | 1008 |
| Same as above plus superheater percentage | 1008 |
| Same as above but substitute firebox area for grate area | 6240 |
| Power L1 | 3030 |
| Power MT | 477.14 |