Data from "Export Locomotives: Steam-Electric-Diesel" Section 17, Locomotive Cyclopedia 1947 (Simmons-Boardman, 1947), p. 1078). Works numbers were 74423-74427, 75149-75157 in April 1947; and 77260-77269 in March 1949.
Most sources describe "701" class as a 4-8-2 (aka Mountain) type with 19" cylinders.. The 1947 LC's table and photograph clearly shows a small 2-8-2. Although the photograph shows "701" as the engine's road number. Locobase suspects the error lay in the road number, as the data describe the 751s, which were based on Newfoundland Railway 2-8-2s.
Data from [], a reprint of the Vulcan magazine last accessed 14 July 2007.v. Works numbers were 6198-6227 in 1954.
These were only the latest in a large series of Mikados built to a common design; Vulcan had supplied 20 (works numbers 5608-5627) in 1947 ([]). These had two more fire tubes and a total heating surface of 1,895 sq ft (176.05 sq m). A Vulcan Foundry list credited the superheater design to MLS.
Vulcan's 1954 contribution had the typical Belpaire firebox and a 4" (102 mm) bar frame that ran continuously from buffer beam on back. With this batch came roller bearings on all axles, including those of the tender.
Data from The Vulcan Foundry Locomotive Works catalogue, archived at [], Plate 42, last accessed 1 July 2021. See also ""Three-Cylinder Locomotive for the Nigerian Railway"", Locomotive Magazine, Volume 31 (15 December 1925), pp. 374-375. (Many thanks to Jorge Cerezo Toledo for his 26 June 2021 email containing links to several sites including the Vulcan Catalogue referred to above.) Works numbers were 3783-3787 in 1925.
The NGR's Chief Mechanical Officer T O B Otway Ruthven established a set of requirements for freight hauling on the Cape Gauge that couldn't be met if the locomotive used the usual two cylinders. So he asked VFL to build him a quintet of these Mikados.
The boiler comprised a wide Belpaire firebox, combustion chamber, and tubes offering a nearly ideal 104:1 length/diameter ratio. Locating the third piston on the centerline under the boiler required a ""special system of cross levers, connected to the outside valve spindles"" to operate the centrally placed piston valve. Thus the two outside motions combined to open and close the buried piston valve. (The third cylinder is hinted at in the unequally long spacing between the first and second driving axles.)
The 801s were among the largest 2-8-2s to be built for the Cape gauge and among the very few to have three cylinders (See Locobase 14560 for Baldwin's octet delivered to the Manila Railway in 1928.) For that matter, very few three-cylinder locomotives operated on the narrow gauge.
| Principal Dimensions by Steve Llanso of Middle Run Media | |||
|---|---|---|---|
| Class | 751 | River | Sir Hugh Clifford |
| Locobase ID | 962 | 8582 | 20907 |
| Railroad | Nigeria Railways | Nigeria Railways | Nigeria Railways |
| Country | Nigeria | Nigeria | Nigeria |
| Whyte | 2-8-2 | 2-8-2 | 2-8-2 |
| Number in Class | 25 | 30 | 5 |
| Road Numbers | 751-774 | 801-805 | |
| Gauge | 3'6" | 3'6" | 3'6" |
| Number Built | 25 | 30 | 5 |
| Builder | Montreal LW | Vulcan Foundry | Vulcan Foundry |
| Year | 1947 | 1954 | 1925 |
| Valve Gear | Walschaert | Walschaert | Walschaert |
| Locomotive Length and Weight | |||
| Driver Wheelbase (ft / m) | 13.25 / 4.04 | 13.25 / 4.04 | 16.83 / 5.13 |
| Engine Wheelbase (ft / m) | 29.25 / 8.92 | 30.17 / 9.20 | 34.33 / 10.46 |
| Ratio of driving wheelbase to overall engine wheelbase | 0.45 | 0.44 | 0.49 |
| Overall Wheelbase (engine & tender) (ft / m) | 56.42 / 17.20 | 60.62 / 18.48 | |
| Axle Loading (Maximum Weight per Axle) (lbs / kg) | |||
| Weight on Drivers (lbs / kg) | 111,900 / 50,757 | 114,548 / 51,958 | 147,952 / 67,110 |
| Engine Weight (lbs / kg) | 143,700 / 65,181 | 161,560 / 73,282 | 197,568 / 89,615 |
| Tender Loaded Weight (lbs / kg) | 109,368 / 49,609 | 84,336 / 38,254 | |
| Total Engine and Tender Weight (lbs / kg) | 270,928 / 122,891 | 281,904 / 127,869 | |
| Tender Water Capacity (gals / ML) | 4800 / 18.18 | 3600 / 13.64 | |
| Tender Fuel Capacity (oil/coal) (gals/tons / Liters/MT) | 11 / 10 | 8.25 / 7.50 | |
| Minimum weight of rail (calculated) (lb/yd / kg/m) | 47 / 23.50 | 48 / 24 | 62 / 31 |
| Geometry Relating to Tractive Effort | |||
| Driver Diameter (in / mm) | 48 / 1219 | 48 / 1219 | 54 / 1372 |
| Boiler Pressure (psi / kPa) | 210 / 1450 | 200 / 1380 | 180 / 1240 |
| High Pressure Cylinders (dia x stroke) (in / mm) | 18" x 24" / 457x610 | 18" x 26" / 457x660 | 18" x 28" / 457x711 (3) |
| Tractive Effort (lbs / kg) | 28,917 / 13116.55 | 29,835 / 13532.94 | 38,556 / 17488.73 |
| Factor of Adhesion (Weight on Drivers/Tractive Effort) | 3.87 | 3.84 | 3.84 |
| Heating Ability | |||
| Tubes (number - dia) (in / mm) | 123 - 2" / 51 | 119 - 2.25" / 57 | |
| Flues (number - dia) (in / mm) | 28 - 5.5" / 140 | 26 - 5.5" / 140 | |
| Flue/Tube length (ft / m) | 16.46 / 5.02 | 19.50 / 5.94 | |
| Firebox Area (sq ft / m2) | 163 / 15.15 | 210 / 19.51 | |
| Grate Area (sq ft / m2) | 35.20 / 3.27 | 38 / 3.53 | 38 / 3.53 |
| Evaporative Heating Surface (sq ft / m2) | 1745 / 162.17 | 1877 / 174.44 | 2290 / 212.75 |
| Superheating Surface (sq ft / m2) | 426 / 39.59 | 489 / 45.45 | 506 / 47.01 |
| Combined Heating Surface (sq ft / m2) | 2171 / 201.76 | 2366 / 219.89 | 2796 / 259.76 |
| Evaporative Heating Surface/Cylinder Volume | 246.87 | 245.11 | 185.12 |
| Computations Relating to Power Output (More Information) | |||
| Robert LeMassena's Power Computation | 7392 | 7600 | 6840 |
| Same as above plus superheater percentage | 8870 | 9196 | 8071 |
| Same as above but substitute firebox area for grate area | 39,446 | 44,604 | |
| Power L1 | 14,820 | 10,338 | |
| Power MT | 1140.92 | 616.18 | |