Data from Baldwin Locomotive Works Specification for Engines as digitized by the DeGolyer Library of Southern Methodist University Volume 29, p. 249. See also Raymond Piltz, "Lumbering Mikes: A Hogger on the McCloud River Railroad Takes a Fond Look at Baldwin's Timber-Hauling 90-Ton Mikados." Railroad History, no. 196 (2007): 58-64. [] . Works numbers were 30850-30851 in May 1907.
A later sister was delivered with a superheater; see Locobase 13047. Raymond Piltz noted that the 14 & 15 each received a superheater
| Principal Dimensions by Steve Llanso of Middle Run Media | |
|---|---|
| Class | 14 |
| Locobase ID | 13046 |
| Railroad | McCloud River |
| Country | USA |
| Whyte | 2-8-2 |
| Number in Class | 2 |
| Road Numbers | 14-15 |
| Gauge | Std |
| Number Built | 2 |
| Builder | Burnham, Williams & Co |
| Year | 1907 |
| Valve Gear | Stephenson |
| Locomotive Length and Weight | |
| Driver Wheelbase (ft / m) | 13.08 / 3.99 |
| Engine Wheelbase (ft / m) | 27 / 8.23 |
| Ratio of driving wheelbase to overall engine wheelbase | 0.48 |
| Overall Wheelbase (engine & tender) (ft / m) | |
| Axle Loading (Maximum Weight per Axle) (lbs / kg) | |
| Weight on Drivers (lbs / kg) | 143,000 / 64,864 |
| Engine Weight (lbs / kg) | 179,000 / 81,193 |
| Tender Loaded Weight (lbs / kg) | 80,000 / 36,287 |
| Total Engine and Tender Weight (lbs / kg) | 259,000 / 117,480 |
| Tender Water Capacity (gals / ML) | 4000 / 15.15 |
| Tender Fuel Capacity (oil/coal) (gals/tons / Liters/MT) | 2800 / 10,598 |
| Minimum weight of rail (calculated) (lb/yd / kg/m) | 60 / 30 |
| Geometry Relating to Tractive Effort | |
| Driver Diameter (in / mm) | 48 / 1219 |
| Boiler Pressure (psi / kPa) | 180 / 1240 |
| High Pressure Cylinders (dia x stroke) (in / mm) | 20" x 28" / 508x711 |
| Tractive Effort (lbs / kg) | 35,700 / 16193.27 |
| Factor of Adhesion (Weight on Drivers/Tractive Effort) | 4.01 |
| Heating Ability | |
| Tubes (number - dia) (in / mm) | 350 - 2" / 51 |
| Flues (number - dia) (in / mm) | |
| Flue/Tube length (ft / m) | 16.50 / 5.03 |
| Firebox Area (sq ft / m2) | 148 / 13.75 |
| Grate Area (sq ft / m2) | 41.50 / 3.86 |
| Evaporative Heating Surface (sq ft / m2) | 3156 / 293.31 |
| Superheating Surface (sq ft / m2) | |
| Combined Heating Surface (sq ft / m2) | 3156 / 293.31 |
| Evaporative Heating Surface/Cylinder Volume | 310.02 |
| Computations Relating to Power Output (More Information) | |
| Robert LeMassena's Power Computation | 7470 |
| Same as above plus superheater percentage | 7470 |
| Same as above but substitute firebox area for grate area | 26,640 |
| Power L1 | 5511 |
| Power MT | 339.85 |