Surviving Steam Locomotive Search Results (status contains construction and builder contains A1 Steam Locomotive Trust (Darlington Works))

Advanced Search
No.ClassF.M. WhyteGaugeRailroad LineLocationStatusBuilder InfoNotes
3403V42-6-24'-8½"LNER A1 Steam Locomotive Trust, Darlington, ENGconstructionA1 Steam Locomotive Trust (Darlington Works), 2026 Construction is scheduled to begin after the newly-built LNER P2 class 2007 'Prince of Wales' is completed.
2007P22-8-24'-8½"LNER A1 Steam Locomotive Trust, Darlington, ENGconstructionA1 Steam Locomotive Trust (Darlington Works)Named Prince of Wales. Construction began in 2014 with its design being based on scrapped P2 class No. 2001 'Cock O' the North'. Expected to be completed sometime in 2027 and will operate excursions on the mainline and heritage railways when completed.
All material Copyright © SteamLocomotive.com
Wes Barris